One lane shut down on Sunshine Bridge due to structural crack

(WAFB)
Published: Aug. 18, 2022 at 1:04 PM CDT|Updated: Aug. 18, 2022 at 1:13 PM CDT
Email This Link
Share on Pinterest
Share on LinkedIn

ST. JAMES PARISH (WAFB) - One lane has been shut down on the Sunshine Bridge in St. James Parish due to a significant crack that was found on one of the 168 vertical structure members.

The Department of Transportation and Development announced on Thursday, Aug. 18 that the westbound right lane is closed.

The following information was provided by DOTD:

Click here to report a typo.